Copper smelter slag treatment by ammonia solution:Leaching process optimization

来源期刊:中南大学学报(英文版)2017年第12期

论文作者:R. Nadirov L. Syzdykova A. Zhussupova

文章页码:2799 - 2804

Key words:copper slag; ammonia solution; metal recovery; central composite design; optimization

Abstract: The feasibility of copper smelter slag processing by ammonia solution treatment was investigated. The central composite rotatable design (CCRD) and approximation method were used to determine the optimum conditions of zinc and copper recovery to a solution. The experimental design was done at five levels of the four operating parameters which were the initial concentration of NH3, the initial Cl ions concentration, leaching time and solid/liquid ratio. Two mathematical models describing dependence of metal recovery on the operating parameters were obtained. The models are successful in predicting the responses. It was found that optimal parameters for zinc and copper recovery are as follows (values for copper are given in brackets): initial CNH3 17.1% (19.9%), initial CCl 160 g/L (160 g/L), leaching process duration 4.56 h (4.13 h), solid/liquid ratio 0.39 (0.53). The maximum Zn and Cu recoveries to solution, obtained experimentally under the conditions, are 81.16% and 56.48%, respectively.

Cite this article as: R. Nadirov, L. Syzdykova, A. Zhussupova. Copper smelter slag treatment by ammonia solution: Leaching process optimization [J]. Journal of Central South University, 2017, 24(12): 2799–2804. DOI:https://doi.org/10.1007/s11771-017-3694-3.

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号