共搜索到12428条信息,每页显示10条信息,共1243页。用时:0小时0分0秒522毫秒
Safety of barricades in cemented paste-backfilled stopesXu Zhao1,Andy Fourie1,Chong-chong Qi31. School of Civil, Environmental and Mining Engineering, University of Western Australia3. School of Resources and Safety Engineering, Central South University摘 要:In underground mining, there has been an increasing use of "cemented paste" for the backfilling......
. The distribution curves of the contact loads show an approximate parabola going downwards, which indicates contact loads are more concentrated. The front non-loading area with a ratio from 1.8% to 5.4% shows an increasing trend with the increase of penetration. However, the change of rear non-loading area is not obvious. It is believed that the conclusions have guidance for the study of rock breaking......
and Safety Engineering, Central South University, Changsha 410083, China Received 20 April 2005; accepted 29 August 2005 safety thickness of the roof (floor) of underground chambers has been confirmed according to the destabilization condition. The influence of amplitude and frequency of blasting vibration......
......
A new wide area damping controller design method considering signal transmission delay to damp interarea oscillations in power systemYANG Bo(杨波), SUN Yuan-zhang(孙元章) (School of Electrical Engineering, Wuhan University, Wuhan 430072, China)Abstract:Wide area damping controller (WADC) is usually utilized to damp interarea low frequency oscillation in power system. However, conventional WADC design......
J. Cent. South Univ. (2016) 23: 1332-1338 DOI: 10.1007/s11771-016-3184-z Plotting and application of predominance area diagram of Me-S-O system based on topological rules XIE Fu-chun(谢富春)1, 2, YIN...: The mathematical topological rule was applied to plot the predominance area diagram. Based on the analysis of the mutually conjugated, only two diagrams were the best topological embryonic graphs to build......
:U459.2 文献标志码:A 文章编号:1672-7207(2011)03-0803-07 Safety accessment of Liuyanghe tunnel... was modified and some countermeasures were put forward, such as reinforcement geology forecast and preliminary support, setting vertical temporary steel support. Construction safety was adjusted using......
Optimal allocation of random access period for wireless body area networkJin hyuk KIM, Chang ki HONG, Sang bang CHOI(Department of Electronic Engineering, Inha University, Incheon 402-751, Korea)Abstract:A wireless body area network (WBAN) allows integration of low power, invasive or noninvasive miniaturized sensors around a human body. WBAN is expected to become a basic infrastructure element......
......
and realization of slope safety assessment system along highway in mountainous area[J]. China Safety Science Journal, 2014, 24(3): 72-78. [5] 林孝松, 许江, 陈洪凯, 等. 山区公路高切坡整体安全评价方法研究[J]. 武汉理工大学学报(交通科学与工程版... Safety risk assessment of high slope blasting construction based on set pair-extension analysis HE Zhongming1, 2, 3, LIU Ke2, FU Hongyuan3, WU Congshi4 (1. Key Laboratory of Special Environment Road......