共搜索到5531条信息,每页显示10条信息,共554页。用时:0小时0分0秒507毫秒
influencing coke strength, while the property of coke is essential to maintaining gas and liquid permeability in a blast furnace. Therefore, an in-depth understanding of the pore structure evolution during the graphitization process can reveal the coke size degradation behavior during its descent in a blast furnace. Coke graphitization was simulated at different heating temperatures from 1100 to 1600......
迁钢2号高炉高风温研究陈冠军1,竺维春1,胡雄光1,蔡景春2,倪苹3,杨天钧4(1.北京市首钢技术研究院2.首钢迁钢公司,河北迁安 0644043.首钢国际工程技术公司,北京 1000414.北京科技大学,北京 100083)摘 要:从迁钢2号高炉系统投产运行现状,分析了风温限制环节,从热风炉,热风管道和高炉接受高风温等全面考察了其实现高风温的可行性.通过迁钢2号高炉开展高风温试验,总结分析了实现高风温的具体措施,阐明高风温不仅与热风炉操作紧密关联,而且原燃料,高炉操作等因素直接影响高炉使用高风温.研究结果表明......
Slag-washing water of blast furnace power station with supercritical organic rankine cycleXIAO Song(肖松), WU Shu-ying(吴淑英), ZHENG Dong-sheng(郑东升)(Faculty of Metallurgical and Energy Engineering... (SWW) of blast furnace was investigated. A schematic of such installation was presented with a description of its operation and the algorithm of calculations of a supercritical power plant. Two......
......
, hematite, silica and calcium oxide in alumina crucible, heating in argon to 1380℃ and holding at this temperature for 1h. The crucible was taken out of furnace and the molten slag was immediately poured...) quenching specimen: the molten slag was rapidly cooled down by water so as to know the in-situ phase status and compositions. The main furnace used in this study was a vertical tube furnace......
on strength test of paste specimens. Results showed that AASC prepared from 14% low modulus water glass and blast furnace slag presented its compressive strength of hardened cement paste of 69.6, 84.0...Solidification/Stabilization of Zinc-lead Tailings by Alkali Activated Slag Cement潘志华1,ZHANG Jun1,LIU Weiqing21. College of Materials Science & Engineering, Nanjing Tech University2. College of Civil......
......
高炉喷煤工艺优化及系统改进周春林1,刘春明1,沙永志2,曹军2(1.辽宁省沈阳市东北大学研究生院2.钢铁研究总院 炼铁室,北京 100081)摘 要:经过长期的发展,当前典型的喷煤工艺流程是:中速磨制粉-热风炉废气+烟气炉-大布袋收粉-并联罐-直接喷吹-单管喷吹+分配器.系统改进的主要内容包括:扩大原煤仓和煤粉仓的容积,改进粉仓的结构,确定适宜的煤粉粒度,提高喷吹罐的初始流化效果,提高分配器的分配精度,改进喷枪材质和结构,完善安全监测控制系统,高温引风机和主排烟风机的变频调速等.需要正确处理系统节能,烟煤配比,......
Numerical simulation for the lower shaft and the hearth bottom of blast furnaceSusen Cheng Tianjun Yang Qingguo Xue, Haibin Zuo, Xiaowu Gao, and Weiguo Yang Metallurgical Engineering School...="ChDivSummary" name="ChDivSummary"><正> One of the methods forming the shell is to appropriately design the cooling staves and hearth without overheating during the campaign life of the furnace. The three......
titanium dioxide was synthesized from titanium containing electric furnace molten slag(TCEFMS)by using an alkali fusion,followed by a hydrolyzation-acidolysis-calcination route.The efects of alkali/slag...Preparation and visible-light photocatalytic property of nanostructured Fe-doped TiO2 from titanium containing electric furnace molten slagYang Li,Yi Yue,Zai-qing Que,Mei Zhang,Min GuoState Key......