简介概要

Comparative stability analyses of traditional and selective room-and-pillar mining techniques for sub-horizontal tungsten veins

来源期刊:International Journal of Minerals Metallurgy and Materials2011年第1期

论文作者:Vidal Félix Navarro Torres Carlos Dinis da Gama Matilde Costa e Silva Paula Falco Neves

文章页码:1 - 8

摘    要:The stability and productivity concerning a modification on the traditional room and pillar for a new selective technique at the Portuguese Panasqueira Mine have been described.The traditional room-and-pillar stoping uses 5.0-m wide rooms with 3.0 m×3.0 m pillars,while the selective room-and-pillar mining technique consists in stoping with rooms of 4.0 m wide and pillars of 4 m×4 m with a subsequent selective cutting of the quartz veins at the mid pillar of approximately 0.5 m high,to obtain a pillar section with an area of 3.0 m×3.0 m.The stability and productivity analyses indicate that the selective technique obtains smaller average pillar safety factor,more rock mass displacement,more extraction and selectivity ratios,and ore grade improvement,compared with the traditional technique.These results show that the selective technique is also more convenient.This proposed selective room-and-pillar mining technique is applicable to any sub-horizontal narrow quartz veins with wolfram,gold,etc.such as the famous La Rinconada gold mine in the Peruvian Andes.

详情信息展示

Comparative stability analyses of traditional and selective room-and-pillar mining techniques for sub-horizontal tungsten veins

Vidal Félix Navarro Torres,Carlos Dinis da Gama,Matilde Costa e Silva,Paula Falco Neves

Mining and Geo-resources Engineering Department of IST,Technical University of Lisbon

摘 要:The stability and productivity concerning a modification on the traditional room and pillar for a new selective technique at the Portuguese Panasqueira Mine have been described.The traditional room-and-pillar stoping uses 5.0-m wide rooms with 3.0 m×3.0 m pillars,while the selective room-and-pillar mining technique consists in stoping with rooms of 4.0 m wide and pillars of 4 m×4 m with a subsequent selective cutting of the quartz veins at the mid pillar of approximately 0.5 m high,to obtain a pillar section with an area of 3.0 m×3.0 m.The stability and productivity analyses indicate that the selective technique obtains smaller average pillar safety factor,more rock mass displacement,more extraction and selectivity ratios,and ore grade improvement,compared with the traditional technique.These results show that the selective technique is also more convenient.This proposed selective room-and-pillar mining technique is applicable to any sub-horizontal narrow quartz veins with wolfram,gold,etc.such as the famous La Rinconada gold mine in the Peruvian Andes.

关键词:

<上一页 1 下一页 >

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号