简介概要

Utilizing partial least square and support vector machine for TBM penetration rate prediction in hard rock conditions

来源期刊:中南大学学报(英文版)2015年第1期

论文作者:GAO Li(高栗) LI Xi-bing(李夕兵)

文章页码:290 - 295

Key words:tunnel boring machine (TBM); performance prediction; rate of penetration (ROP); support vector machine (SVM); partial least squares (PLS)

Abstract: Rate of penetration (ROP) of a tunnel boring machine (TBM) in a rock environment is generally a key parameter for the successful accomplishment of a tunneling project. The objectives of this work are to compare the accuracy of prediction models employing partial least squares (PLS) regression and support vector machine (SVM) regression technique for modeling the penetration rate of TBM. To develop the proposed models, the database that is composed of intact rock properties including uniaxial compressive strength (UCS), Brazilian tensile strength (BTS), and peak slope index (PSI), and also rock mass properties including distance between planes of weakness (DPW) and the alpha angle (α) are input as dependent variables and the measured ROP is chosen as an independent variable. Two hundred sets of data are collected from Queens Water Tunnel and Karaj-Tehran water transfer tunnel TBM project. The accuracy of the prediction models is measured by the coefficient of determination (R2) and root mean squares error (RMSE) between predicted and observed yield employing 10-fold cross-validation schemes. The R2 and RMSE of prediction are 0.8183 and 0.1807 for SVMR method, and 0.9999 and 0.0011 for PLS method, respectively. Comparison between the values of statistical parameters reveals the superiority of the PLSR model over SVMR one.

详情信息展示

Utilizing partial least square and support vector machine for TBM penetration rate prediction in hard rock conditions

GAO Li(高栗)1, 2, LI Xi-bing(李夕兵)1

(1. School of Resources and Safety Engineering, Central South University, Changsha 410083, China;
2. Changsha Environmental Protection Vocational College, Changsha 410004, China)

Abstract:Rate of penetration (ROP) of a tunnel boring machine (TBM) in a rock environment is generally a key parameter for the successful accomplishment of a tunneling project. The objectives of this work are to compare the accuracy of prediction models employing partial least squares (PLS) regression and support vector machine (SVM) regression technique for modeling the penetration rate of TBM. To develop the proposed models, the database that is composed of intact rock properties including uniaxial compressive strength (UCS), Brazilian tensile strength (BTS), and peak slope index (PSI), and also rock mass properties including distance between planes of weakness (DPW) and the alpha angle (α) are input as dependent variables and the measured ROP is chosen as an independent variable. Two hundred sets of data are collected from Queens Water Tunnel and Karaj-Tehran water transfer tunnel TBM project. The accuracy of the prediction models is measured by the coefficient of determination (R2) and root mean squares error (RMSE) between predicted and observed yield employing 10-fold cross-validation schemes. The R2 and RMSE of prediction are 0.8183 and 0.1807 for SVMR method, and 0.9999 and 0.0011 for PLS method, respectively. Comparison between the values of statistical parameters reveals the superiority of the PLSR model over SVMR one.

Key words:tunnel boring machine (TBM); performance prediction; rate of penetration (ROP); support vector machine (SVM); partial least squares (PLS)

<上一页 1 下一页 >

相关论文

  • 暂无!

相关知识点

  • 暂无!

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号