对宝山铜矿矿山开采二期工程某些问题的商榷

来源期刊:中南大学学报(自然科学版)1983年第4期

论文作者:李德成

文章页码:79 - 87

关键词:无底柱分段崩落法; 二期工程; 矿山开采; 采矿方法; 开采方法; 矿山生产能力; 有底柱分段崩落法; 铜矿体; 地下开采; 可行性研究报告

摘    要:本文对兰州有色冶金设计院提出的《宝山铜矿矿山开采二期工程可行性研究报告》的开采方法、地下采矿方法及矿山生产能力等问题进行全面的论证与分析,得出了如下不同的结论: 用无底柱分段崩落法作为确定开采方法的主要依据,确定全部采用地下开采法的结论值得进一步商榷。最好选用有底柱分段崩落法,有底板漏斗的空场法等多种有内在联系的采矿方法,以适应矿体变化大的特点。矿山生产能力以不超过1000吨/日为宜。

Abstract: In this paper, we shall discuss the research report on the feasibility mining engineering of Baoshan Copper Mine in the second phase of the project covering the mining method, underground mining method and mine production capacity suggested by the Lanzhou Designing Institution of Non- ferrous Metallurgy, and shall make an all-round demonstration and analy- sis. The different conclusions are suggested as follows, The conclusion that the sublevel caving method can be used as the major basis in determining the mining method, that is, determining the underground mining method in the second phase of the project, is open to question. For the purpose of being suited to the characteristic that the ore body changes greatly, it is better to selectively use sublevel caving (with floor pil1ar) and open stoping with drawing chute located in foot wall etc. with various internal relations. And it is better to limit the min- ing capacity to below 1000 ton/day.

详情信息展示

 

<上一页 1 下一页 >

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号