多中段高溜井卸矿口气流分布及影响因素

来源期刊:中南大学学报(自然科学版)2020年第4期

论文作者:蒋仲安 王九柱 王亚朋

文章页码:1059 - 1068

关键词:多中段高溜井;卸矿口;最大风速;压差分布;气流分布;影响因素

Key words:multiple level of high ore pass; unloading port; the maximum wind speed; differential pressure distribution; air distribution; influencing factors

摘    要:为了治理多中段高溜井卸矿后由气流变化造成的粉尘污染,采用量纲分析法分类推演影响气流分布的因素,建立多中段高溜井卸矿的相似实验模型,研究多中段高溜井卸矿口的压差、气流速度及其影响因素。研究结果表明:卸矿后,一、二中段以诱导气流为主,而三、四中段以冲击气流为主;随着卸矿流量增加,各中段卸矿口的最大风速先增大后减小,其中,在各流量下,最大风速出现在卸矿流量为1.0 kg/s时;当卸矿流量增加到1.2 kg/s时,各中段卸矿口的最大风速下降,并且对二、四中段的最大风速影响较明显;二、四中段卸矿口最大风速分别降低26.0%和22.7%;各中段卸矿口最大风速随着矿石粒径和含水率增加而降低,但矿石粒径对二中段卸矿口最大风速的影响较明显;一、二、四中段卸矿口最大风速随着卸矿高度增加而增大,而三中段卸矿口的最大风速随着卸矿高度增加先增大后减小。

Abstract: To prevent and control the dust pollution caused by the change of air flow after ore unloading in multiple level of high ore pass, the dimensionality analysis method was used to classify and deduce the influencing factors of airflow distribution. A similar experimental model of multiple level of high ore-pass was established, and differential pressure, airflow velocity and its influencing factors of unloading port in multiple level of high ore-pass were studied. The results show that after unloading, the first and second level are dominated by induced airflow, while the third and fourth level are dominated by the impact air flow. With the increase of the unloading flow rate, the maximum wind speed of unloading port in each level increases firstly and then decreases. At each flow rate, the maximum wind speed appears at the unloading flow rate of 1.0 kg/s. When the unloading ore flow rate increases to 1.2 kg/s, the maximum wind speed decreases, and it has obvious influence on the maximum wind speed of the unloading port in the second and fourth level, which decrease by 26.0% and 22.7% respectively. The increase of ore size and moisture content can reduce the maximum wind speed at each unloading port, but the effect of the ore size on the maximum wind speed at the unloading port in the second level is more obvious. The maximum wind speed at the unloading port in the level of the first, second and fourth increases with the increase of ore unloading height, while the maximum wind speed at the unloading port in the level of the third increases firstly and then decreases with the increase of ore unloading height.

相关论文

  • 暂无!

相关知识点

  • 暂无!

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号