简介概要

Mine laneway 3D reconstruction based on photogrammetry

来源期刊:中国有色金属学报(英文版)2011年第z3期

论文作者:ZHANG Chun-sen

文章页码:686 - 691

Key words:digital mine; mine laneway; photogrammetry; 3D reconstruction; direct linear transformation (DLT)

Abstract: Aiming at the problem of 3D reconstruction for mine laneway, the technique route and step were given based on digital close range photogrammetry and traverse surveying. 3D coordinates of laneway traverse point, photogrammetric station, control strip points were obtained by electronic total station based on mine coordinate system. The feature points were extracted from the scene images. The camera was calibrated by direct linear transformation (DLT). 3D relative coordinates of the arbitrary feature points in mine laneway were calculated after feature points being matched, in which the origin of coordinate system is photogrammetric station. The 3D absolute coordinates of the feature points in mine laneway can be obtained by the combined adjustment of photogrammetry and non-photogrammetric observations and coordinate conversion. The measurable 3D model of the underground laneway terrain surface was constructed with the 3D coordinates of feature points on the image pairs obtained. The measurable 3D model of a corridor was reconstructed by the mentioned method and the experiment precision with an average standard deviation of 0.013 6 m between the 3D model and practical measure was obtained by electronic total station. The experimental resulted show the validity of the proposed approach.

详情信息展示

Mine laneway 3D reconstruction based on photogrammetry

ZHANG Chun-sen

(College of Geomatics, Xi’an University of Science and Technology, Xi’an 710054, China)

Abstract:Aiming at the problem of 3D reconstruction for mine laneway, the technique route and step were given based on digital close range photogrammetry and traverse surveying. 3D coordinates of laneway traverse point, photogrammetric station, control strip points were obtained by electronic total station based on mine coordinate system. The feature points were extracted from the scene images. The camera was calibrated by direct linear transformation (DLT). 3D relative coordinates of the arbitrary feature points in mine laneway were calculated after feature points being matched, in which the origin of coordinate system is photogrammetric station. The 3D absolute coordinates of the feature points in mine laneway can be obtained by the combined adjustment of photogrammetry and non-photogrammetric observations and coordinate conversion. The measurable 3D model of the underground laneway terrain surface was constructed with the 3D coordinates of feature points on the image pairs obtained. The measurable 3D model of a corridor was reconstructed by the mentioned method and the experiment precision with an average standard deviation of 0.013 6 m between the 3D model and practical measure was obtained by electronic total station. The experimental resulted show the validity of the proposed approach.

Key words:digital mine; mine laneway; photogrammetry; 3D reconstruction; direct linear transformation (DLT)

<上一页 1 下一页 >

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号