某铜矿不同采矿进路布置开采稳定性数值模拟

来源期刊:有色金属科学与工程2013年第2期

论文作者:赵奎 邵海 徐峰 曾鹏 邓晓平 王明

文章页码:46 - 50

关键词:采矿进路;稳定性;数值模拟

Key words:mining entrance; stability; numerical simulation

摘    要:某铜矿井下现采用3种不同采矿进路布置开采方案.为研究不同采矿进路布置方案的开采稳定性,在前期现场调查、室内实验的基础上,利用ANSYS软件进行建模,然后导入FLAC3D有限差分软件中,采用摩尔-库仑破坏准则计算,模拟自重条件下,3种不同方案的应力分布情况.分析3种不同采矿进路布置开采后的最大及最小主应力分布情况,研究结果表明:采矿进路布置沿矿体走向与上盘接触的开采稳定性程度最低.

Abstract: The paper adopts three different approaches of mining entrances under the well in a copper mine. In order to study the stability of different approaches, three models are built by using ANSYS software based on the field investigation and laboratory experiment, then led into FLAC3D finite software. Adopting Moore - Coulomb failure criterion calculation, three different schemes of stress distribution are simulated in gravity conditions in order to study stability. Through the analysis of the maximal and minimum principal stress after mining in three different mining entrances, the results indicate that the stability of mining vertical the ore body strike connected with the upper plate is the lowest.

详情信息展示

<上一页 1 下一页 >

相关论文

  • 暂无!

相关知识点

  • 暂无!

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号